How to commence repair works associated with the apartment?

The initial stage of the repair of aged apartments is typically the destruction and dismantling first of just about all in the dilapidated walls and partition surfaces, removing the wall structure and ceiling coating. This stage is usually one of the particular most “dirty” stages from the repair.

One more being among the most important and “dusty” performs is the window block replacement. It is necessary to do this very first of all since dirt and dust is going to be unallowable throughout following stages and it is restricted at all to be able to open windows throughout painting and picture works (large drops of the heat and moisture are unallowable). After increasing windows and windowsills it is required to pack all of them immediately in polyethylene film and to be able to cover windowsills in addition with the fiberboard (in so that it will avoid scratches).

The following stage is wiring. Electrical wiring can be installed in walls or along the floor. Wiring is produced inside the plumbing to ensure electric safety and boost reliability. The tube protects wiring from external damages and allows to replace the wire entirely without breaking surfaces and floor simply by inserting the new wire instead regarding the old one.

House Painting comes after the wiring. The frequent mistake during the simultaneous performing of such performs occurs when staff forget to place out among the cables and house artists have already covered and smoothed out your wall. As a result, additional functions are necessary to be able to seal chases on the finished wall. The particular places of the feed switch plus wall outlet location and the number should be thought-out within advance. The scheme of power cabling is usually integrated into the design job.

Later on the method must be willing to service in circumstance of failures. In addition to typically the wirings, the telephone cable connection and the TV SET cable are organized. The power cable should not be laid out there near the mobile phone and antenna cables to avoid noise pickup and disturbance. Probably the most peculiar instant is laying out the TV cable connection. In order in order to make two (or three) TV makes its presence felt the apartment the 2nd cable is often simply “firmly soldered” in parallel, so the cable opposition is lowered. Because a result, the image quality is deteriorated, many programs cannot be received plus etc. In order to avoid this kind of situation it will be necessary to ask a specialist together with special equipment. He will measure the signal level of the particular each TV-feeder and install TV-amplifiers or even TV-filters.

Painting is considered the most long-term process, for this reason it is carried out simultaneously in almost all premises, when it is feasible. Delays are associated with the technology. Each applied level of the plastsorter (or filling inside finishing) must dry out completely ahead of the job will continue.

Functions in sanitary arrangements and the kitchen area begin simultaneously with house painting. It is better to fulfill so-called “dirty” works inside the first place and simultaneously. Inside accordance with the master plan of the hygienic technician location welding, wall chasing plus pipe run are conducted. Steam rad admissions are prepared, taps and conference are mounted, yet radiators aren’t installed.

Then works inside sanitary arrangements are usually conducted based on the strategy. The bath will be mounted, then wall space are smoothed out there and the floor tile is laid about walls. The next stage is putting together ceiling and installing tiles on the floor. And from last other hygienic devices, mixers in addition to accessories are mounted.

After wiring, unit installation of rosette discs and terminal boxes the voltage is checked in most point. Ends of cabling are insulated plus laid out into rosette plates. Sockets and breakers aren’t installed during this specific stage in order to save their particular surface appearance. The finish puttying regarding walls is conducted simultaneously. The technologically exact power over drying of the coating of the plaster (filling) is transported out by drymeter. It is a special instrument of which measures moisture associated with the material.

The following stage is the process of fill. Fill up can be made with different materials : from usual masonry cement-sand mixture in order to self-aligning floors. The advantage of typically the simple mixture is its cheapness, typically the disadvantage is that will such mixture is much harder in-line at the degree and the ultimate dry time of such fill is 40 days, just then the following stage of typically the use floor can be conducted, i actually. e. the time will be too long. Self-leveling self-aligning floors are more expensive, yet more technological. Aligning occurs almost “automatically” i. e. smooth solution of combination is poured away, then it works and you receive the horizontal area. The final dry out time is 15 days i. e. you have significant time economy. The system “warm floor” is mounted into the fill. When the so-called “wet processes” are inapplicable the technology associated with the dry aligning (the fill technology) is used angles for floors together with adjustable floor battens are mounted.

Following fill door containers and door are usually installed. Installing of entry doors must take directly into the account thickness of future flooring. After installation the door can be used off its handles and removed until the end regarding repair or packed into polyethylene film to protect coming from damages. Simultaneously roof may be painted and the tile can be laid for the reason that premises where it had been planned. The floor tile must be put within the absolutely dried out overlay.

Finishing regarding the floor increasing depends on the planned covering. Inside most cases (if finish covering is not really the tile) fill up is covered by simply bitumen mastic in addition to plywood sheets are laid. They are fixed to the ground by self-tapping anchoring screws. One plywood page is fixed by 30-50 self-tapping anchoring screws to provide the close fixing of plywood and long-term service from the floor without squeak in addition to bulging. The particle board gives the added heat- and acoustic insulation. After increasing of the plywood is completed, wallpaper for painting can end up being pasted on wall space.

In premises exactly where finish covering of the floor will be laminated flooring or perhaps parquet hoard, the ordinary wallpapers are pasted (not for painting) in the 1st place. Then Printing Press Dubai covering is mounted.

If finish addressing in the floor will be the block parquet, the parquet is laid in the first place, after that it is scraped and covered by simply one layer regarding lacquer. After this specific the ordinary wall-papers are pasted and the parquet is included in the rest tiers of lacquer (depending within the quality of the parquet plus lacquer). The pointed out consequence is associated only with such scrambling process whenever the great quantity of dust is usually created. Despite the fact that good floor grinders are equipped with the particular vacuum cleaner, the particular sufficient amount associated with dust is brought on on surrounding subject matter including walls. Dirt is very tartish and is terribly washed off. That is why so as not to harm wallpapers, they are pasted after rushing and in order the parquet usually do not absorb the excessive moisture it is usually covered by the one layer of ename before wallpaper pasting.

After this the particular main works could be considered to be finished. That is left simply to install the plinths, decorative elements, breakers and sockets, curtain holders, to hang up doors, plant-bands plus others.

To conclude this is necessary to note that typically the sequence of works was listed inside general and may change according to the definite situation – the number of areas in premise, your own resources, peculiarities regarding the construction associated with the multilevel building. It is dependent on common sense and every person effective at analysis can independently create such the sequence.